Client: Parkes Shire Council
Location: Parkes NSW
Duration: April - June 2023


Works consisting of:


  • Bulk & Detailed Earthworks for construction of pond 2.
  • Construction of pond islands.
  • Reshaping swale that connects pond 2 and pond 3. 


Feedback from Client

"SME were extremely professional to work with. Their work was completed to design specifications, on time and to budget.

SME were easy to work with - some unexpected design anomalies had to be addressed and SME were proactive in assisting to find a practical solution.

Environmental controls were installed and maintained throughout the project, safety was of high importance to the team.

SME work closely with PSC throughout the entire process to achieve best possible outcome for the project.

PSC couldn't be more happy with the works completed"